• Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored
  • Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored
  • Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored
  • Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored
  • Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored
  • Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored

Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored

Color: White,Black , Green, or as Requested
Certification: CE
Feature: Corrosion Resistant, Oxidation Resistance, Wear-resistant
Usage: Water Filter
Material: PP
Kind: Woven
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Model NO.
HS-tube
Product Name
High Strength PP Geotextile Tube with Good Price
Keyword
Geotextile Tube
Application
Water Conservancy
Size
3X4FT, 3.5X7FT, 6X6FT, 7.5X10FT, or Customize
Length
164.01FT -328.08FT /Roll (or 50-100m/Roll)
Width
2m-6m
Weight
100-900g
Sample
Available
Transport Package
Packed in Standard Exported Package
Specification
As customer requested.
Trademark
Haisan
Origin
China, Shandong
HS Code
3923290000
Production Capacity
50000 Square Meter Per Day

Product Description

Factory supply fast delivery PP Geotextile Tube Marine for Construction Shoreline Restored

Description
Geotextile Tube is one of the most effective components that are most usually used in protective structure of waterproof erosion. Soft mattress is covered to the places where water flows to reduce the impact energy of water flow and protect soil particles from being flown away by water flow by means of its filtration function, thus, ensuring the stability of soil mass.
Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored


Technical data

Item Unit Technical Parameters
Tube 500 Tube 750 Tube 1000
Breaking strength MD KN/m >= 70 120 200
CD KN/m >= 90 120 200
Elongation of break MD %<= 20 20 20
CD %<= 10 10 10
Sewing Tensile strength >=% 80 80 80
Bursting Strength(CBR) KN>= 8 14 18
Equivalent opening size(O90) mm 0.2-0.6 0.2-0.6 0.2-0.6
Permeability(Q50) L/m2/s>= 20 13 15
UV-resistance(500HRS strength retention) %>= 90 80 80


Feature

1. High strength, low deformation
2. Durability: steady property, not easy to resolved, air slaked and can keep the original property long term
3. Anti-erosion: anti-acid, anti-alkali, resists insects and mould 
4. Permeability: could control the sieve size to retain certain permeability
5.Effective high volume containment
6.Efficient dewatering and volume reduction
7.Cost effective
8.No special equipment required 

Application
1. Bank protection
2. Dyke protection
3. Base protection
4. Embankment engineering
5. Dam engineering
6. Cofferdam engineering
Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored

The whole process has three-steps:

Step 1: Filling -- Sludge (dredged material) is pumped into the tube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate tube?container's unique fabric confines the fine grains of the material.

Step 2: Dewatering -- Clear effluent water simply drains from the tube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the tube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.

Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the tube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.


Our Factory
Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored

Certification
Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored

FAQ
Factory Supply Fast Delivery PP Geotextile Tube Marine for Construction Shoreline Restored


Contact Us


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory
Management System Certification
ISO 9001, ISO 14001, IATF16949