Dewatering Geobag Using for artificial lagoon clean out
Product Application
This knowledge technology have a three-step process:
Step 1: Filling -- Sludge (dredged material) is pumped into the tube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate tube?container's unique fabric confines the fine grains of the material.
Step 2: Dewatering -- Clear effluent water simply drains from the tube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the tube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.
Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the tube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.
c
Welcome to Contact us :
Qingdao Haisan New Energy Co.,Ltd
Senior Sales: Ms Karen Zhou
Website: haisan.en.made-in-china.com
Add: No.155 Jia-13, Wenchang Road, Licang District, Qingdao, Shandong, China