Customization: | Available |
---|---|
Usage: | for Embankment |
Type: | Punching |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Application
This knowledge technology have a three-step process:
Step 1: Filling -- Sludge (dredged material) is pumped into the dewatering bags container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The dewatering bags ?container's unique fabric confines the fine grains of the material.
Step 2: Dewatering -- Clear effluent water simply drains from the dewatering bags container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the dewatering bags container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.
Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the dewatering bags container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.
Main Features
1. High strength, low deformation dewatering bags
2. Durability: steady property, not easy to resolved, air slaked and can keep the original property long term
3. Anti-erosion: anti-acid, anti-alkali, resists insects and mould dewatering bags
4. Permeability: could control the sieve size to retain certain permeability dewatering bags
5. Effective high volume containment
6. Efficient dewatering and volume reduction
7. Cost effective
8. No special equipment required
Specification list
Item |
Unit |
Technical Parameters | |||
HT85 | HT90 | HT120 | |||
Breaking strength |
MD | KN/m >= | 85 | 90 | 120 |
CD | KN/m >= | 85 | 120 | 120 | |
Elongation of break |
MD | % <= | 12 | 12 | 12 |
CD | % <= | 12 | 12 | 12 | |
Tensile strength @2% strain | KN/m | 14 | 38 | 20 | |
Tensile strength @5% strain | KN/m | 38 | 80 | 80 | |
Seam Tensile strength | KN/m | 80 | 85 | 100 | |
Bursting Strength(CBR) | KN>= | 10 | 12 | 15 | |
Equivalent opening size(O90) | mm | 0.40 | 0.40 | 0.4 | |
Permeability(Q50) | L/m2/s>= | 42 | 35 | 14 | |
UV-resistance(500HRS strength retention) |
%>= | 90 | 90 | 90 |