450GSM Construction Geotextiles Tube Bag of Earthwork Product

Product Details
Customization: Available
Color: Black
Certification: CE
Still deciding? Get samples of US$ 1/Square Meter
Request Sample
Gold Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14001, IATF16949
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
  • 450GSM Construction Geotextiles Tube Bag of Earthwork Product
Find Similar Products

Basic Info.

Model NO.
HSGT200/200
Feature
Corrosion Resistant, Oxidation Resistance, Wear-resistant
Usage
Insulation, Waterproof, Water Filter
Material
PP
Kind
Non-woven
Product
Geotube Bag
Weight
150GSM, 180GSM, 265GSM, 275GSM
Effective Pore Size
0.3mm
Burst Strength
7kn
Transverse Tensile Strength
95kn/M
Longitudinal Tensile Strength
70kn/M
Fabric
One Side Heat Treated
MOQ
1*20gp
Sample
Free Sample
Payment
T/T, L/C
Transport Package
According to Customer′s Requires
Specification
3ft*4ft, 3.5ft*7ft, 6ft*6ft, 7.5ft*10ft, 10ft*15ft
Trademark
Haisan
Origin
Qingdao, China
HS Code
3923290000
Production Capacity
100000 Square Meters Per Month

Product Description

450GSM Construction Geotextiles tube Bag of Earthwork Product
 

Product Application
Geotechnical dewatering bag   made of high strength PP woven geotextile fabrics large bag , the diameter can be varied according to needs, the most has been more than tens of meters long.Geotechnical dewatering pipe bag was initially used in dike engineering, but now it has been applied to environmental protection, agriculture and other fields after the efforts of the majority of technical workers. With the deepening of people's research, its application field will be more and more extensive.

This knowledge technology have a three-step process:

Frist Step:
Filling -- The bag body is made of high strength, sludge (dredged material) is pumped into the dewatering bags. Environmentally-safe flocculant polymers are added to the sludge water, which makes the solids bind together and water separate. The dewatering bags unique fabric confines the fine grains of the material.

Second Step:
Dewatering -- The clear effluent water simply drains from the dewatering bags through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. The bag body can be filled repeatedly until the allowable height of the bag material is reached, 
. Over 98% of solids are captured, and clear filtrate water can be collected and recirculated through the system. The decanted water is often of a quality that can bereturned for processing or returned to native waterways without additional treatment. 
Last Step:
Consolidation -- After repeated filling and drainage, the fine particles left in the bag will gradually solidify due to drying. After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 92 percent. When full, the dewatering bags and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.
450GSM Construction Geotextiles Tube Bag of Earthwork Product
450GSM Construction Geotextiles Tube Bag of Earthwork Product
Dewatering bags Main Features
1. Use high tensile strength PP new material, with low deformation
2. Steady property, not easy to resolved, air slaked and can keep the original property long time
3. Anti-acid, anti-alkali, anti-UV,  anti-aging,resists insects and mould 
4. Could control the sieve size to retain certain permeability according to the pump pressure.
5. Effective high volume containment
6. Efficient dewatering and volume reduction
7. Easy construction,good economical benefit.
8. No special equipment required 
9. Environmental protection



450GSM Construction Geotextiles Tube Bag of Earthwork Product


Packing
450GSM Construction Geotextiles Tube Bag of Earthwork Product




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier